 |

Aug 31, 2010: News Room: 33% Increase in Project Area To 160 Square Kilometres Mariana Lithium Brine Project, Argentina (more...)
Aug 05, 2010: News Room: $1 MILLION DRILL PROGRAM PLANNED MARIANA LITHIUM BRINE PROJECT, ARGENTINA (more...)
Jul 16, 2010: News Room: TNR GOLD ANNOUNCES THE PASSING OF DIRECTOR JOHN FRASER (more...)
Jul 13, 2010: News Room: TNR/ILC JOINT VENTURE PARTNER CRICKET RESOURCES INC. COMPLETES FORGAN LAKE QUALIFYING TRANSACTION (more...)
Jul 07, 2010: News Room: TNR GOLD INCENTIVE STOCK OPTIONS GRANTED (more...)
Jun 25, 2010: News Room: TNR GOLD 2010 ANNUAL GENERAL AND SPECIAL MEETING HELD/PROCEEDS WITH SPINOUT OF INTERNATIONAL LITHIUM (more...)
|
 |

| | September 27, 2007 Crew Mobilized to El Tapau Project, Argentina; Work Commencing Immediately
|
| | TNR Gold Corp. ("TNR") is pleased to announce that exploration crews and project equipment are currently being mobilized to its El Tapau Project, located 130 kilometres west of the city of San Juan, in San Juan province.
Work on the El Tapau Project will commence immediately. It will focus on an area of 600m by 400m that yielded gold values ranging from trace to 19 g/tonne averaging 2.2 g/t from 157 sample sites collected from previous exploration. A geophysics program is being developed to further define a strong large chargeability high, approximately 1.5 km by 2.0 km (east-west) in extent, underlying this area and open to the northwest.
This work program's goal is to locate targets for a Phase I drill program of approximately 5000m later this fall. Results of this program will be released as they become available.
The El Tapau Project is believed to host an intrusive-related gold system in the Frontal cordillera of the eastern Andes. Numerous historical underground copper mines are located on the claim, and quartz stockwork zones are common throughout the project area.
El Tapau is strategically located in proximity to the Company's El Salto property, which will allow for work programs to be carried out simultaneously on both programs. El Tapau and El Salto properties are accessible year-round by paved and dirt roads.
This news release has been prepared under the supervision of John Fraser, P.Geo (BC), TNR's Qualified Person as defined by NI-43-101.
On Behalf of the Board,
Gary Schellenberg,
Director
THE TSX VENTURE EXCHANGE DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE. Statements in this press release other than purely historical information, historical estimates should not be relied upon, including statements relating to the Company's future plans and objectives or expected results, are forward-looking statements. News release contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in the Company's business, including risks inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements. |
| |
| | You can view the Next News Room item: Fri Oct 5, 2007, Final Drill Results From Tyner Lake Project
You can view the Previous News Room item: Wed Sep 26, 2007, TNR Announces Precious and Base Metal Drill Intercepts at the La Carolina Project, Argentina
You can return to the main News Room page, or press the Back button on your browser.
|
|
 |
|
 |